The table measures 60 inches wide, 30 inches deep, and presents a practical footprint for prep islands or wall runs while weighing approximately 89 pounds. Purchasing teams account for transport and installation based on these specifications.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug and clear the work table. Remove debris from the 304 stainless steel top and 5" backsplash. Apply a mild detergent with a soft cloth and scrub edges and rounded bullnose carefully. Rinse with clean water and dry with lint-free towels. Clean legs, crossrails, and adjustable bullet feet; inspect welds and seals. Degrease vents and nearby oven areas to prevent fires. Schedule weekly coil and seal checks to extend equipment life and meet CSA and health inspection standards.#@@#Additional Info#@#Advance Tabco TKMS-305 work table is 60" wide by 30" deep, featuring a 16-gauge Type 304 stainless steel top, 5" backsplash, open base, adjustable feet, rounded edge, NSF certified, and weighs 89 pounds.#@@#General Info#@#Description #@#
The table measures 60 inches wide, 30 inches deep, and presents a practical footprint for prep islands or wall runs while weighing approximately 89 pounds. Purchasing teams account for transport and installation based on these specifications.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect the Advance Tabco TKMS-305 work table weekly and tighten hardware to maintain structural integrity. Sanitize the 16 gauge Type 304 stainless steel top after each shift using a neutral pH cleaner and a soft cloth to prevent corrosion. Remove debris from the 5" backsplash junction and clean welds with nonabrasive pads. Level the unit via adjustable bullet feet and verify crossrail connections for load stability. Schedule quarterly NSF compliance checks and document maintenance.