Open base design facilitates undercounter storage and equipment placement while keeping access to utilities and cleaning straightforward. Facility planners adapt layouts quickly, using the table as a central island or a wall-mounted run with integrated backsplash control.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug equipment and clear the table. Mix warm water with mild detergent as needed. Scrub the 14 gauge 304 stainless steel top and 1.5" up-turn with a soft cloth; avoid steel wool. Rinse with clean water and dry thoroughly to prevent corrosion. Clean galvanized legs and crossrails with non-abrasive cleaner. Inspect seals and bullet feet; tighten or replace as needed. Regular cleaning prevents contamination, fire risk, higher bills, equipment failure, and inspection failures.#@@#Additional Info#@#Advance Tabco TFLG-308 work table features a 96" x 30" 14-gauge Type 304 stainless steel top with a 1.5" rear up-turn, a galvanized base, adjustable feet, rounded edge, NSF certified, and weighs 126 pounds.#@@#General Info#@#Description #@#
Open base design facilitates undercounter storage and equipment placement while keeping access to utilities and cleaning straightforward. Facility planners adapt layouts quickly, using the table as a central island or a wall-mounted run with integrated backsplash control.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect the 304 stainless steel top weekly and remove food debris to prevent corrosion. Clean with pH-neutral detergent and warm water, then rinse and dry to avoid water spots. Lubricate adjustable bullet feet threads monthly and tighten fittings to maintain level. Sanitize surfaces after heavy prep using EPA-registered sanitizer per label contact time. Verify galvanized legs and crossrails for loose fasteners and tighten as needed. Replace damaged splash seals promptly.