Stop compromising draft quality for throughput. This countertop draft tower combines robust stainless construction with a glycol-cooled circulation loop to maintain a consistent serving temperature while supporting three simultaneous pours, ensuring lines keep moving during peak service.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug and close valves before cleaning the Zeus draft tower. Remove faucet handles and disassemble faucets; soak parts in warm water with mild detergent for 10–15 minutes. Flush glycol-cooled lines with approved cleaner; follow contact times and rinse thoroughly. Wipe stainless surfaces and drain pan with a non-abrasive cloth and neutral pH cleaner. Inspect seals and fittings; replace worn parts. Sanitize beer-contact components per CSA and local health rules before returning to service.#@@#Additional Info#@#Glastender’s ZT-3-MFR Zeus countertop draft tower features three stainless steel faucets with ceramic columns and a mirror finish.#@@#General Info#@#Description #@#
Stop compromising draft quality for throughput. This countertop draft tower combines robust stainless construction with a glycol-cooled circulation loop to maintain a consistent serving temperature while supporting three simultaneous pours, ensuring lines keep moving during peak service.
#@@# Durable Stainless Construction#@#
The tower features all stainless steel for the column, faucets, and drain pan, resisting corrosion and enduring daily use in commercial bars and kitchens. The mirror finish simplifies cleaning and maintains a professional appearance under constant service.
#@@# Glycol Cooling System#@#
An insulated copper glycol loop keeps product temperature consistent from keg to tap, minimizing foam and preserving flavor during extended service runs. This system reduces the risk of warm lines and stabilizes pour performance under varying ambient conditions.
#@@# Triple Faucet Capacity#@#
Three stainless faucets provide parallel dispensing capability to meet high-volume demand and decrease wait times at busy service points. The faucet arrangement enables staff to pour multiple selections or sizes simultaneously, enhancing throughput.
#@@# Insulated Restriction Lines#@#
Insulated restriction lines between the tower and cooling loop minimize temperature gain along the path, ensuring each pour matches the calibrated set point. Consistent line temperatures reduce waste and support portion control effectively.
#@@# Integrated Drain Pan#@#
A mirror finish surface mount drain pan with a removable perforated insert contains spillover and simplifies cleaning cycles, keeping the countertop sanitary and preventing liquid migration into service areas. The removable insert allows quick access for sanitation without disassembly.
#@@# Countertop Mount Design#@#
Countertop mounting secures the tower directly to the service surface for compact installation and straightforward maintenance access beneath the counter.
#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect glycol loop connections weekly; tighten fittings to prevent leaks and maintain cooling efficiency. Flush glycol lines quarterly with an approved solution and verify coolant concentration per CSA recommendations. Clean mirror finish surfaces with a nonabrasive cleaner and soft cloth; avoid bleach or chloride cleaners that corrode stainless steel. Sanitize faucets after each shift by disassembling handles, soaking parts in warm, soapy water, rinsing, and air-drying.