The grill carries NSF and cMETus listings, confirming testing to relevant foodservice and electrical safety standards. Visual indicators such as a power light assist staff in confirming operational status during busy shifts.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug the grill and let plates cool. Remove crumbs and the grease tray; dispose of grease per local rules. Wipe grooved glass-ceramic plates with a soft cloth and mild detergent; use a non-abrasive pad for stuck residue. Rinse with a damp cloth and dry. Check door seals, handles, and power cord for wear. Clean exterior stainless housing with a neutral cleaner. Regular cleaning prevents bacteria, reduces fire risk, lowers energy use, and extends equipment life.#@@#Additional Info#@#Cadco’s CPG-BBQ jumbo panini grill has black glass-ceramic grooved plates, a 15.75" x 11.75" cooking area, adjustable thermostat to 700°F, stainless steel housing, cool-touch handle, pull-out grease tray, and 3.1kW operation.#@@#General Info#@#Description #@#
The grill carries NSF and cMETus listings, confirming testing to relevant foodservice and electrical safety standards. Visual indicators such as a power light assist staff in confirming operational status during busy shifts.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect and clean glass-ceramic plates daily to prevent carbon buildup and preserve heat transfer. Use a nonabrasive scraper while plates remain warm, then wipe with a damp cloth and approved detergent. Empty and degrease the pull-out tray after each service to avoid flare-ups. Verify thermostat calibration monthly and record readings. Tighten electrical connections quarterly, confirm NEMA 6-20P cord integrity, and test the unit under load before peak shifts.