The trough measures 60 inches wide by 18 inches deep and 4 inches high, providing ample surface capture area across long service lines. Project planners can specify the unit for linear zones where continuous drainage and easy access align with workflow requirements.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug nearby equipment and remove floor debris. Scrub grate with a nylon brush and warm, soapy water; rinse thoroughly. Lift grating and remove the stainless steel strainer basket; empty solids and wash with sanitizer. Inspect the 4" O.D. waste pipe and clear blockages; confirm pitch toward waste for proper drainage. Dry all surfaces to prevent corrosion. Clean weekly or more often under heavy use to maintain food safety, reduce fire risk, lower utility costs, and pass CSA inspections.#@@#Additional Info#@#Advance Tabco FTG-1860 60" x 18" x 4" floor trough is made of 14 gauge 304 stainless steel. It features a removable strainer basket, stainless subway grating, and a pitched channel to a 4" O.D. waste pipe.#@@#General Info#@#Description #@#
The trough measures 60 inches wide by 18 inches deep and 4 inches high, providing ample surface capture area across long service lines. Project planners can specify the unit for linear zones where continuous drainage and easy access align with workflow requirements.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect the Advance Tabco FTG-1860 daily for debris in the stainless steel subway grating and remove solids using the stainless strainer basket. Flush the 4" O.D. waste pipe with warm water weekly to prevent buildup. Sanitize interior surfaces with a mild alkaline cleaner, then rinse thoroughly. Verify pitch toward waste and level every month; tighten mounting hardware as needed. Replace damaged seals immediately to maintain NSF compliance.