The system uses R-600a refrigerant to achieve efficient cooling while minimizing environmental impact, and service personnel can reference the 117-pound unit weight for handling and installation planning. Installers will appreciate the defined parameters for site preparation and freight handling.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug the icemaker and empty the 33 pounds bin. Mix warm water with mild detergent (use gallons or liters as needed) and wipe all stainless surfaces with a soft cloth. Remove and wash the evaporator tray and scoop in warm, soapy water; rinse and air dry. Clean condenser area and vents; inspect for grease to prevent fires. Verify seals and check water lines for deposits. Restart after unit is completely dry to maintain food safety and CSA compliance.#@@#Additional Info#@#Summit BIM182ADA stainless steel icemaker produces 33 lbs daily and stores 33 lbs. It operates on 115 volts, 11.8 amps, uses R-600a refrigerant, is water-cooled, CSA listed, ADA compliant, and measures 17.75" W by 32.5" H for commercial kitchens.#@@#General Info#@#Description #@#
The system uses R-600a refrigerant to achieve efficient cooling while minimizing environmental impact, and service personnel can reference the 117-pound unit weight for handling and installation planning. Installers will appreciate the defined parameters for site preparation and freight handling.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#Ensure a 115V outlet is available for installation. Verify space accommodates the 17.75" width and check that the unit can be properly vented.#@@#Maintenance Guide#@#Maintain the Summit BIM182ADA icemaker with regular cleaning and checks for reliable output and sanitation. Inspect the water supply and fittings weekly for leaks and replace damaged hoses. Descale the water-cooled condenser quarterly with approved descaler; disconnect power at 115 volts before service. Clean interior surfaces and the bin with a neutral sanitizer after ice removal and discard the first two production cycles.