The compact electric booster heater delivers precise high-temperature boost to support continuous dishroom cycles in institutional and commercial settings. Engineers designed this unit to minimize footprint while providing industrial-grade heating performance for demanding operations.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug the booster heater and shut off power at the breaker. Drain the Castone® lined tank per manufacturer instructions and rinse with clean water. Clean exterior stainless panel and powder-coated body using mild detergent and non-abrasive cloth. Wipe legs and vents to remove grease. Flush inlet screen and check electrical connections for corrosion. Sanitize food-contact surfaces when required. Refill, restore power, and verify proper 240v operation and 7 kW heating before use.#@@#Additional Info#@#Hatco’s C-7-240-3-QS electric booster heater stores 6 gallons and delivers 7.0 kW at 240v/60Hz, 3-Ph for reliable wash temperatures. Stainless steel front, Castone® lined tank, NSF and cULus certified, 118 pounds, made in USA.#@@#General Info#@#Description #@#
The compact electric booster heater delivers precise high-temperature boost to support continuous dishroom cycles in institutional and commercial settings. Engineers designed this unit to minimize footprint while providing industrial-grade heating performance for demanding operations.
Rated at 7000 Watts and configured for 240 volts, the unit matches common commercial electrical services while delivering measured wattage for engineering calculations. The product ships as a quick ship model to reduce lead time for retrofit and new build projects.
#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect electrical connections monthly and tighten terminal screws for reliable 240v operation. Flush the Castone® lined tank quarterly to remove scale; open the drain and run water until clear, then inspect the element for encrustation and descale with an approved solution when buildup exceeds 0.1 inches. Verify thermostat calibration semiannually by measuring outlet temperature with a calibrated thermocouple and adjust per the service manual.