Stop compromising cleanliness for convenience. This pedal valve assembly converts manual sink operation into a hands-free, durable system that increases sanitation, reduces cross-contamination, and sustains high throughput in busy back-of-house environments. Facilities will gain precise flow control and long service life through robust mechanical design and commercial-grade materials.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug nearby equipment. Drain and shut water to the valve assembly. Use a mild detergent and soft brush to remove grease and food debris from the pedal, floor mounts, gooseneck, and short elbow. Flush lines until clear water runs. Inspect seals and 1/2" NPT connections; tighten or replace worn parts. Clean aerator to maintain 2.2 GPM flow. Dry all metal surfaces and reapply NSF-approved lubricant to moving joints. Restore water and test for leaks before service.#@@#Additional Info#@#T&S Brass B-0502-537K double pedal valve mounts to the floor for hands-free use. It features a 6" gooseneck, 2.2 GPM aerator, low-lead construction, and 1/2" NPT connections. NSF and CSA certified, it weighs 7.65 pounds, ideal for foodservice.#@@#General Info#@#Description #@#
Stop compromising cleanliness for convenience. This pedal valve assembly converts manual sink operation into a hands-free, durable system that increases sanitation, reduces cross-contamination, and sustains high throughput in busy back-of-house environments. Facilities will gain precise flow control and long service life through robust mechanical design and commercial-grade materials.
#@@# Double Floor#@#
This unit installs as a double floor mount configuration to serve two outlet points from a single control, optimizing space behind prep sinks. Operators achieve simultaneous activation for left and right faucets while maintaining stable mounting and alignment on commercial flooring.
#@@# Six Inch Gooseneck#@#
A 6-inch rigid gooseneck delivers clearance for pots and tall containers while preserving a compact footprint on the sink deck. Staff will handle large pans without repositioning equipment, improving workflow during peak production.
#@@# 2.2 GPM Aerator#@#
The integrated 2.2 GPM aerator balances water savings with required rinsing force to remove soils quickly. Maintenance teams can rely on consistent spray performance while facilities meet common flow regulations.
#@@# Low Lead Construction#@#
Manufactured to comply with low lead requirements, the valve supports potable water safety and regulatory compliance in institutional installations. Procurement officers can document material conformity for health inspections and audits.
#@@# Half Inch NPT#@#
The 1/2 inch NPT inlet provides a standard thread interface for straightforward plumbing connection to existing water lines. Plumbers will complete installation with common fittings, minimizing retrofit time and additional parts.
#@@# NSF Certified#@#
This product carries NSF certification, verifying that components meet sanitation and material standards for foodservice environments. Institutional managers receive verifiable certification for compliance programs and vendor documentation.
#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect the T&S Brass B-0502-537K pedal valve weekly for leaks and secure floor anchors; tighten bolts to manufacturer specs. Flush supply lines monthly to remove debris and prevent aerator clogs; soak the 2.2 GPM aerator in vinegar for ten minutes, then rinse. Lubricate pedal linkage quarterly with NSF-approved lubricant and ensure the 1/2" NPT connections are tight. Replace worn seals immediately and document maintenance dates.