Designed for riser mount installation on existing ranges, the unit integrates into crowded lines while preserving counter space. Installers connect the liquid propane supply and secure the melter for stable operation during heavy use, ensuring efficiency and reliability.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug gas supply and cool unit before cleaning. Remove crumb tray; wash with warm, soapy water, then rinse and dry. Wipe stainless steel exterior with non-abrasive cleaner and soft cloth. Brush infrared burners gently; avoid water on controls and valves. Clean rack positions and chrome rack with detergent, rinse, and dry. Inspect seals and gas connections; tighten loose fittings. Clean vents and oven cavity regularly to reduce grease buildup and maintain efficiency.#@@#Additional Info#@#Southbend’s P24-CM-LP 24" liquid propane cheesemelter delivers 20,000 BTU with two infrared burners, a 90-second preheat, five rack positions, and a removable crumb tray.#@@#General Info#@#Description #@#
Designed for riser mount installation on existing ranges, the unit integrates into crowded lines while preserving counter space. Installers connect the liquid propane supply and secure the melter for stable operation during heavy use, ensuring efficiency and reliability.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect infrared burners weekly and remove debris to sustain consistent heat output. Clean stainless steel surfaces daily with a mild detergent and soft cloth to prevent corrosion. Empty and wash the removable crumb tray after each shift to reduce fire risk. Verify gas connections and valves for leaks using a soapy solution before operation. Adjust rack guides as needed and confirm 90 second preheat achieves target temperature. Schedule CSA and NSF inspections per facility policy.