This precharged, 50 ft run minimizes heat gain and maintains refrigerant temperature over extended distances. Technicians obtain predictable pressure and efficiency characteristics, reducing the risk of capacity loss in long piping layouts.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug the ice machine and remove ice. Flush water lines and sanitize with an approved solution. Wipe surfaces with a non-abrasive cleaner. Inspect the 50 ft. insulated line set for kinks, leaks, and damage; replace as needed. Clean condenser coils and vents to remove grease and dust. Check seals and connections; tighten fittings to prevent leaks. Schedule routine cleaning to reduce bacteria, lower energy use, prevent fires, and meet CSA standards.#@@#Additional Info#@#Scotsman 3BRTE50-EH insulated line set offers 50 ft. of pre-insulated copper tubing for ice machines, ensuring efficient refrigerant flow and minimal thermal loss; CSA-listed, weighs 53 pounds, and meets Scotsman service parts standards.#@@#General Info#@#Description #@#
This precharged, 50 ft run minimizes heat gain and maintains refrigerant temperature over extended distances. Technicians obtain predictable pressure and efficiency characteristics, reducing the risk of capacity loss in long piping layouts.
Manufacturers form the tubing and insulation to withstand commercial installation stresses and ambient exposure. Service teams experience fewer failures and extended component life, lowering replacement frequency and labor costs.
Engineers design the line set to match common ice machine connections and refrigerant types used in professional settings. Facilities planners achieve straightforward integration without extensive modifications to existing systems.
The unit weighs 53 pounds, which allows two technicians to manage transportation and positioning without specialized lifting equipment. Project managers plan manpower and staging accurately for on-site deliveries.
The insulation reduces condensate formation and thermal ingress, which helps maintain consistent evaporator conditions. Operations staff preserve machine efficiency and reduce the risk of moisture-related damage to surrounding structures.
Components meet industry installation practices and permit straightforward verification during inspections and maintenance. Maintenance crews access routine service points with minimal disruption to daily operation.
#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#Verify the product upon arrival and ensure no damage occurred during transit. Contact the carrier if there are any shipping issues.#@@#Maintenance Guide#@#Install the Scotsman 3BRTE50-EH 50 Ft. insulated line set per manufacturer specs to prevent refrigerant loss and ensure thermal efficiency. Inspect insulation monthly for tears or compression and replace damaged sections. Check flare connections for leaks with an electronic detector and conduct a pressure test post-installation. Clean condensers and evaporators quarterly to reduce load. Monitor system pressures weekly and document trends. Tighten brackets and secure routing to prevent wear.