Engineers designed this drain pan to handle demanding refrigeration and evaporator coil applications while maintaining precise fit and reliable condensate control. PartsTown constructed the pan from rigid material with exacting dimensions that match common evaporator 17 coil layouts, ensuring consistent drainage and simplified replacement in commercial coolers and walk-ins. Facility managers will find installation straightforward and maintenance intervals predictable thanks to the pan geometry and accessible profile.
LongDescription#@#NA#@@#Cleaning Instructions#@#Clean the RP DRP001 evaporator drain pan after each service shift to prevent contamination of clean items and hands and to deter pests. Flush loose debris and crumbs, then scrub with a mild detergent and warm water using a soft brush. Rinse thoroughly and sanitize per facility CSA procedures. Dry completely before reinstalling to prevent corrosion and extend serviceable life. Inspect for damage and replace if necessary.#@@#Additional Info#@#PartsTown RP DRP001 drain pan is 23.7" x 8" with a 2.15" depth and weighs 0.63 pounds. It’s designed for evaporator coils 17 to collect condensate and route drainage; CSA-compatible materials resist corrosion for efficient management.#@@#General Info#@#Description #@#
Engineers designed this drain pan to handle demanding refrigeration and evaporator coil applications while maintaining precise fit and reliable condensate control. PartsTown constructed the pan from rigid material with exacting dimensions that match common evaporator 17 coil layouts, ensuring consistent drainage and simplified replacement in commercial coolers and walk-ins. Facility managers will find installation straightforward and maintenance intervals predictable thanks to the pan geometry and accessible profile.
#@@# Pan Dimensions#@#
The pan measures approximately 24 by 8 inches with a height near 2.15 inches, providing a low-profile footprint that fits tight evaporator cavities. Technicians benefit from the accurate width and length that align with many standard coil banks, reducing labor time during service.
#@@# Drain Capacity#@#
Designers sized the trough to collect and channel condensate efficiently, minimizing pooling and overflow risk during peak defrost cycles. Operators will observe stable drain performance that helps prevent water damage and supports cooler hygiene.
#@@# Material Integrity#@#
Fabricators selected corrosion-resistant material that withstands routine exposure to moisture and cleaning agents, extending service life in humid environments. Maintenance crews will report fewer replacements compared with untreated pans under similar operating conditions.
#@@# Weight And Handling#@#
The unit weighs approximately 0.63 pounds, keeping handling safe for a single technician during removal and installation. Procurement teams receive a lightweight spare that reduces shipping costs and simplifies stock management.
#@@# Compatibility Fit#@#
Engineers matched the profile to common evaporator 17 coil arrangements, improving interchangeability across multiple equipment models. Service managers will find inventory consolidation easier when one part serves several cooler platforms.
#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect the drain pan weekly to remove debris and prevent clogs. Use warm water and mild detergent; scrub with a soft brush and rinse to avoid residues. Check pan alignment and secure fasteners monthly to prevent damage. Measure liquid capacity during servicing; record volumes in gallons or liters as per protocols. Replace pans with corrosion or warping immediately to maintain sanitation. Use CSA-rated tools for electrical work and follow lockout/tagout procedures during maintenance.