Skip to main content

53582 KIT,MIDD ELE UPG 3PH 208V

PartsTown

$924.29
(No reviews yet) Write a Review
SKU:
53582
Weight:
5.08 LBS
Shipping:
Calculated at Checkout
Length:
21.5
Label Option type:
rectangles
Net Price:
616.19
Product Taxonomy:
CulinaryDepot>>Parts
Manufacturer:
PartsTown
List Price:
1232.38
Trigger BC Integration:
Y-6/2/2026_6:00PM
Taxonomy Weight:
5.08
email_price:
no
msrp_price:
no
call_price:
no
map_price:
no
add_to_cart:
no
MAP Price:
924.29
login_price:
no
Primary Image:
PartsTown_53582.png
Sale Price:
924.29
Ship From:
60101
Keyfeatures5:
Compatible with PartsTown BL53582 parts
Keyfeatures4:
Lightweight 5.08 pounds for easy handling
Keyfeatures6:
Meets CSA safety requirements
Keyfeatures:
Upgrades three-phase systems for 208V
Keyfeatures3:
Compact 21.5-inch length for tight spaces
Keyfeatures2:
Optimizes midline equipment performance
short_description:
Optimize electrical performance with the PartsTown 53582 kit, a midline upgrade for three-phase systems measuring 21.5" long, 19.7" wide, 2" high, and weighing 5.08 lbs.
Lead Time:
2 - 3 Business Days
Adding to cart… The item has been added
Stop compromising system performance for convenience. This three-phase 208V electrical upgrade kit offers a targeted solution for facilities requiring reliable, code-compliant power conversion and distribution for midrange equipment. It enables consistent operation under sustained load and simplifies integration into existing service panels. Designed for commercial foodservice and institutional environments, the kit reduces installation complexity while meeting regulatory and practical demands for robust electrical upgrades.
LongDescription#@#NA#@@#Cleaning Instructions#@#Wipe high-touch surfaces (menu covers, shakers, chair backs, door handles) with a detergent solution, then disinfect per label contact time. Clean booth crevices and under shelves with a stiff brush to remove crumbs and grease. Rinse and dry wood or vinyl; apply polish to prevent degradation. Inspect and tighten fasteners during routine cleaning. Maintain records to support CSA and health-inspection compliance.#@@#Additional Info#@#PartsTown BL53582 53582 KIT,MIDD ELE UPG 3PH 208V upgrades three-phase 208V electrical distribution for commercial cooking equipment, measures 21.5" x 19.7" x 2", weighs 5.08 pounds, and installs inline with existing panels.#@@#General Info#@#Description #@# Stop compromising system performance for convenience. This three-phase 208V electrical upgrade kit offers a targeted solution for facilities requiring reliable, code-compliant power conversion and distribution for midrange equipment. It enables consistent operation under sustained load and simplifies integration into existing service panels. Designed for commercial foodservice and institutional environments, the kit reduces installation complexity while meeting regulatory and practical demands for robust electrical upgrades. #@@# Power Conversion#@# This kit converts single or legacy circuits to three-phase 208V output suitable for midrange appliances, eliminating intermittent derating and voltage imbalance under load. Installers will appreciate the clear terminal assignments and compact layout that accelerate wiring and commissioning processes. #@@# Compact Footprint#@# Engineers will find a shallow profile that fits tight spaces, measuring 21.5 inches in length, 19.7 inches in width, and 2 inches in height, simplifying retrofits in confined electrical closets. Technicians can mount the unit without extensive cabinet modification, reducing labor time and disruption to operations. #@@# Service Weight#@# The assembly weighs 5.08 pounds, allowing a single technician to handle positioning and mounting without mechanical assistance. Field service and replacement cycles become faster, as staff can maneuver the unit safely during routine maintenance. #@@# Compliance Ready#@# Components derive from industry-grade specifications intended to support installations that adhere to applicable safety standards, including CSA where required. This reduces the administrative burden of sourcing compliant parts. Project managers can document conformity during inspections with supplier traceability data. #@@#Delivery Details#@# • Please ensure to handle the product with utmost care. • Check if the product you have received has all the essential parts and accessories. • Make sure to examine the product for damage before signing the delivery receipt. • Contact customer service for delivery concerns. • Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect electrical connections monthly and tighten all terminals to prevent arcing and heat buildup. Clean dust and grease from components with compressed air and a solvent safe for electrical parts. Verify 3-phase 208V voltage and phase rotation before commissioning. Replace damaged wiring or connectors immediately and use CSA-listed parts for replacements. Log maintenance actions, dates, and measurements to track performance and predict component replacement needs.