Delivers on a pallet in a knocked down format to reduce freight costs and simplify receipt in constrained storage areas. Maintenance personnel and installers reassemble the unit on site without specialized tools, returning the rack to operation quickly.
LongDescription#@#NA#@@#Cleaning Instructions#@#Wipe aluminum frame and pan slots daily with mild detergent and warm water; rinse and dry immediately to prevent corrosion. Disinfect high-touch areas like handles and casters with an EPA-registered sanitizer per label directions. Inspect casters and fasteners weekly; tighten as needed. Remove food residue under shelves to deter pests and prevent contamination of clean pans and staff hands, supporting health-code compliance and a professional dining impression.#@@#Additional Info#@#Omcan USA 13506 mobile pan rack holds twenty 18" x 26" pans with 3" spacing in a 20.5" W x 26" D x 69" H size, made of aluminum with a curved top, end loading, open sides, 5" casters, KD shipping, and weighs 38 pounds.#@@#General Info#@#Description #@#
Delivers on a pallet in a knocked down format to reduce freight costs and simplify receipt in constrained storage areas. Maintenance personnel and installers reassemble the unit on site without specialized tools, returning the rack to operation quickly.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect the Omcan USA 13506 rack weekly and tighten fasteners to maintain structural integrity. Clean aluminum surfaces with a nonabrasive detergent and warm water; rinse and dry to prevent spotting. Lubricate 5" casters monthly with a light machine oil and verify wheel bearings for wear. Check pan guides and remove debris from 3" spacing to ensure smooth insertion. Replace damaged components per CSA guidelines and document maintenance dates for audit traceability.