Skip to main content

Micro Matic 2840 Pass Thru 0.5" Barb Inlet and Outlet 3 Station Beer Manifold

Micro Matic

$97.46
(No reviews yet) Write a Review
SKU:
2840
Weight:
0.00 LBS
Shipping:
Calculated at Checkout
SKU Number:
2840__1152
Filter Type:
Manifolds
email_price:
no
Tags:
Draft Beer System Parts
Label Option type:
rectangles
Net Price:
86.03
msrp_price:
no
Ship From:
34604
Product Taxonomy:
CulinaryDepot>>Commercial Refrigerator>>Refrigeration Parts and Accessories>>Bar Refrigeration Draft Parts and Accessories>>Couplers, Distributors, & Regulators
call_price:
no
map_price:
no
Mfr Toll Free:
(866) 327-4159
Packed By:
1 Each
add_to_cart:
no
MAP Price:
97.46
Manufacturer:
Micro Matic
login_price:
no
List Price:
191.18
Trigger BC Integration:
Y-6/24/2026_6:00PM
Filter_Manufacturer:
Micro Matic
Filter_Type:
Manifolds
Primary Image:
Micro Matic_2840.png
warranty:
Micro Matic_2840_1.pdf
manual:
Micro Matic_2840_2.pdf
Sale Price:
97.46
Keyfeatures5:
Optimizes draft line balance and flow
Keyfeatures4:
Compact for tight backbar spaces
Keyfeatures6:
CSA compliant for commercial use
Keyfeatures:
Three-station pass-thru beer manifold
Keyfeatures3:
Durable stainless construction
Keyfeatures2:
0.5" barb inlet and outlet
short_description:
Micro Matic 2840 pass thru 0.5" barb inlet and outlet 3 station beer manifold offers precise flow control for three draft lines. Technicians use stainless steel with CSA-compliant fittings for durability and easy maintenance.
Lead Time:
2 - 3 Business Days
PRO:
yes
Adding to cart… The item has been added
Stop sacrificing keg line consistency for complexity. This three-station pass-thru manifold consolidates flow control into a compact assembly, enabling precise distribution to three draft lines while maintaining sanitation and serviceability. Designed for commercial draft systems, it supports high-frequency use in bars, restaurants, and institutional settings where uptime and line integrity are crucial.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug keg lines and relieve pressure. Disconnect manifold from lines and wipe exterior with a food-safe degreaser. Flush passages with warm water, then circulate a brewery-approved sanitizer for specified contact time. Brush barb inlets and outlets to remove residue. Rinse thoroughly and air dry before reassembly. Schedule coil and vent cleaning weekly and inspect seals monthly to prevent contamination, fires, and equipment failure.#@@#Additional Info#@#Micro Matic 2840 Pass Thru 0.#@@#General Info#@#Description #@# Stop sacrificing keg line consistency for complexity. This three-station pass-thru manifold consolidates flow control into a compact assembly, enabling precise distribution to three draft lines while maintaining sanitation and serviceability. Designed for commercial draft systems, it supports high-frequency use in bars, restaurants, and institutional settings where uptime and line integrity are crucial. #@@# Inlet Outlet#@# This unit features a 0.5" barb inlet and matching outlet to connect directly to tubing, minimizing fittings and leak points. Installers will save space and reduce pressure loss by using the direct-barb configuration for short runs and manifold routing. #@@# Three Station Control#@# The manifold provides three independently routed stations, allowing operators to serve multiple kegs or lines from a single source. Technicians can isolate a single line for service without disrupting the remaining two, which keeps service windows short and draft lines operational. #@@# Pass Thru Design#@# A pass-thru layout routes fluid straight through the body for predictable flow paths and simple plumbing schemes. Plumbers gain a straightforward run that reduces elbows and unions, lowering potential clog and corrosion sites. #@@# Durable Construction#@# Manufacturers build manifolds to resist corrosion and maintain dimensional stability under regular cleaning cycles. Operators will notice consistent performance across repeated sanitation procedures and temperature variations common in backbar environments. #@@# Serviceability Focus#@# Technicians can access fittings and tubing without dismantling surrounding components, thanks to the compact footprint and accessible barbs. Maintenance teams will perform tubing swaps and pressure checks faster, cutting routine maintenance time significantly. #@@#Delivery Details#@# • Please ensure to handle the product with utmost care. • Check if the product you have received has all the essential parts and accessories. • Make sure to examine the product for damage before signing the delivery receipt. • Contact customer service for delivery concerns. • Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect manifold connections daily for leaks and tighten clamps to maintain pressure integrity. Flush lines with approved cleaner after prolonged idle periods and follow manufacturer chemical concentration guidelines. Replace worn barb fittings and gaskets at first sign of degradation to prevent contamination. Calibrate flow balance across three stations quarterly and verify inlet and outlet diameters match hose specifications. Record maintenance actions in a log for compliance and traceability.