Stop compromising shelf stability for convenience. This top-track set delivers accurate alignment, consistent load support, and NSF compliance for busy kitchens and storage facilities, enabling reliable rail mounting for sliding units that require a single track run between stationary supports. Operators gain durable, code-friendly infrastructure that integrates with modular shelving to optimize layout and traffic flow.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug and remove attached components. Disassemble track sections per Metro instructions and wipe surfaces with a mild detergent solution. Scrub grease with a non-abrasive brush, rinse with clean water, and dry completely to prevent corrosion. Vacuum debris from top-track cavities and clean NSF-certified joints thoroughly. Inspect fasteners and seals; tighten or replace as needed. Regular cleaning reduces bacteria, lowers fire risk, improves efficiency, and helps pass CSA and health inspections.#@@#Additional Info#@#Metro's TTS7NA 7 ft. Super Erecta MetroMax Q top-track set assembles track runs between units, supports NSF-compliant installations, weighs 47.5 pounds, and integrates with Metro Super Erecta shelving for kitchen and storage layouts.#@@#General Info#@#Description #@#
Stop compromising shelf stability for convenience. This top-track set delivers accurate alignment, consistent load support, and NSF compliance for busy kitchens and storage facilities, enabling reliable rail mounting for sliding units that require a single track run between stationary supports. Operators gain durable, code-friendly infrastructure that integrates with modular shelving to optimize layout and traffic flow.
#@@# Track Length#@#
This set supplies seven feet of continuous track designed for rail mounting in high-traffic zones. Installers will appreciate precise dimensions that simplify planning for runs between stationary units and reduce on-site modification time.
#@@# Load Capacity#@#
Engineers design the track to distribute loads across supported spans, enabling secure attachment of sliding components and heavy storage. Facility managers can expect stable operation under routine stock handling without frequent realignment.
#@@# Construction Material#@#
Fabricators manufacture the track from corrosion-resistant metal with commercial-grade finishes to withstand repeated contact and cleaning cycles. Maintenance teams will reduce replacement frequency and preserve hygienic surfaces that meet kitchen sanitation protocols.
#@@# NSF Certification#@#
Third-party testing certifies the assembly for NSF requirements, assuring compliance with health department expectations for food service environments. Purchasing agents obtain traceable documentation that supports inspections and procurement standards.
#@@# Compatibility Range#@#
Designers integrate the track with Super Erecta and MetroMax Q systems, allowing flexible layout changes and part interchangeability across existing shelving inventories. Operations managers will minimize spare part variety and streamline upgrades.
#@@# Installation Efficiency#@#
Technicians receive a complete track set that contains necessary sections for assembling runs, eliminating the need for multiple part orders.
#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect the Metro TTS7NA track set weekly for debris and corrosion; tighten fasteners and replace worn clips immediately to maintain alignment. Grease sliding surfaces with food-grade lubricant every six months; avoid excess to prevent buildup. Verify NSF label and confirm secure anchoring to walls using recommended hardware. Measure track run periodically; correct sag by adjusting supports. Keep records of inspections and parts replaced for compliance and warranty validation.