The kit weighs 11 pounds and ships as a complete assembly sized for spans to match shelf runs. Field crews should review the spec sheet and coordinate with the project engineer of record before ordering to confirm site approval and anchorage details.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug equipment and clear the area. Remove grease and debris from ovens, vents, and exhaust hoods using a degreasing solution and a stiff brush. Wash food-contact surfaces with a food-safe sanitizer; rinse and air dry. Clean refrigeration coils and replace door seals when worn. Inspect electrical connections and wipe vents free of dust. Follow CSA and local codes; document each cleaning and schedule regular intervals to reduce contamination, fire risk, energy costs, and equipment failures.#@@#Additional Info#@#Metro SA60BC 79" seismic sway brace kit fits 1" round posts and supports 60" shelves, designed for use with qwikSLOT and required when using SAFP seismic foot plates; chrome finish, 11 pounds, consult project engineer and site approval prior to sale.#@@#General Info#@#Description #@#
The kit weighs 11 pounds and ships as a complete assembly sized for spans to match shelf runs. Field crews should review the spec sheet and coordinate with the project engineer of record before ordering to confirm site approval and anchorage details.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Use the Metro SA60BC 79" seismic sway brace kit with 1" round posts to stabilize 60" shelves when using qwikSLOT and SAFP seismic foot plates; consult the project engineer of record for site approval before installation. Inspect connections monthly, tighten fasteners to manufacturer torque specifications, apply corrosion inhibitor to chrome surfaces, replace damaged components immediately, and document maintenance intervals and actions to ensure compliance with CSA and local codes.