Engineers designed the rack to interface with common wall grid systems and shelving accessories used in commercial kitchens. Planners achieve cohesive storage configurations by integrating this rack into existing Metro Productivity System layouts, conserving materials and installation time.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug equipment and remove lids. Wash with warm water and mild detergent, scrubbing all surfaces with a soft brush. Rinse thoroughly and air dry or towel dry to prevent corrosion. Inspect Metro IWA-11K3 epoxy-coated finish and Microban protection for damage; replace if coating chips. Clean vents and surrounding areas to remove grease and reduce fire risk. Record cleaning frequency to meet CSA and NSF standards and to avoid equipment failure and higher utility costs.#@@#Additional Info#@#Metro IWA-11K3 SmartWall lid rack measures 13-1/2" W x 8-1/2" D. It mounts to wall grids to organize lids. Features Metroseal 3 epoxy coating, Microban protection, NSF certification, and weighs 2 pounds for reliable storage.#@@#General Info#@#Description #@#
Engineers designed the rack to interface with common wall grid systems and shelving accessories used in commercial kitchens. Planners achieve cohesive storage configurations by integrating this rack into existing Metro Productivity System layouts, conserving materials and installation time.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Place the Metro IWA-11K3 SmartWall lid rack on a secure wall grid at recommended height to minimize strain and maintain workflow. Inspect Metroseal 3 epoxy coating weekly and wipe with a neutral pH cleaner to remove grease. Sanitize surfaces with an approved sanitizer compatible with Microban® protection. Tighten fasteners monthly and replace worn anchors. Record maintenance actions and verify NSF compliance during routine audits to ensure reliable, hygienic operation.