NSF certification confirms the sink meets sanitation and material standards for foodservice environments. Procurement teams receive documentation that supports inspections and aligns with institutional health requirements.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug nearby equipment and clear the sink area. Remove debris from the bowl and basket drain. Mix mild detergent with warm water and scrub the stainless steel with a soft cloth, following grain lines. Rinse and dry with a clean towel to prevent spots. Clean faucet holes and surrounding deck; remove scale with a non-abrasive descaler if needed. Sanitize food contact surfaces per CSA or local guidelines. Inspect seals and drains; repair or replace worn parts to avoid leaks.#@@#Additional Info#@#John Boos PB-DISINK201608 Pro-Bowl Drop-In Sink features a 20" x 16" x 8" stainless steel bowl in a 23-5/8"W x 21-5/8"D x 8"H deck, with 4" faucet holes and a 3-1/2" drain opening. NSF certified for commercial kitchens.#@@#General Info#@#Description #@#
NSF certification confirms the sink meets sanitation and material standards for foodservice environments. Procurement teams receive documentation that supports inspections and aligns with institutional health requirements.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect seams and welds weekly for corrosion and tighten mounting hardware to maintain washdown integrity. Clean bowls after each shift using nonabrasive detergent and warm water; rinse thoroughly to prevent residue. Sanitize with an EPA-registered sanitizer per label directions and allow complete air dry. Verify deck-mount faucet holes remain clear and check 3-1/2" drain and basket drain for clogs; remove debris and reassemble securely. Maintain level installation for proper drainage.