Receive the rack shipped assembled and certified to NSF standards, ensuring immediate deployment and sanitary compliance. Procurement teams will shorten installation schedules and meet regulatory requirements while sourcing domestically manufactured equipment in the USA.
LongDescription#@#NA#@@#Cleaning Instructions#@#Clean high-touch zones on the Channel 410A-OR roll-in oven rack and surrounding surfaces daily. Use a mild detergent and warm water to remove spills, then sanitize with an EPA-approved surface disinfectant following label dilution and contact time. Rinse food-contact areas, allow full dry, and inspect casters and welds. Regular cleaning prevents cross-contamination, improves customer perception, and supports health code compliance.#@@#Additional Info#@#Channel 410A-OR Roll-In Oven Rack fits 30 bun pans (28.5" W x 18" D x 69.75" H). It has a side-load design, 2" spacing, and aluminum construction. It withstands -45° to 575°F, ships assembled, and features 4" high-temp swivel casters.#@@#General Info#@#Description #@#
Receive the rack shipped assembled and certified to NSF standards, ensuring immediate deployment and sanitary compliance. Procurement teams will shorten installation schedules and meet regulatory requirements while sourcing domestically manufactured equipment in the USA.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect caster bearings monthly and tighten fasteners to maintain caster alignment and prevent frame stress. Clean aluminum surfaces with a neutral pH cleaner and soft cloth; rinse thoroughly and dry to prevent spotting. Remove dust and debris from pan slots using a soft brush to ensure smooth roll-in operation. Verify 2-inch slot spacing and replace bent guides immediately. Lubricate caster swivel points with high-temperature lubricant every six months.