This model holds cULus certification and ships made in USA, which supports procurement policies that require certified safety standards and domestic manufacturing. Buyers gain documented conformity for code compliance and predictable lead times.
LongDescription#@#NA#@@#Cleaning Instructions#@#Wipe exterior surfaces of the Berner ARC16-3108E-3 with a mild detergent and soft cloth; rinse and dry. Disinfect high-touch zones like control switches, access panel edges, and mounting edges using EPA-approved sanitizer per label. Inspect fasteners and motor enclosures monthly; tighten and clear debris. Clean under shelves and around installation to avoid pests. Regular cleaning prevents contamination, maintains appearance, and supports health-code compliance.#@@#Additional Info#@#Berner ARC16-3108E-3 108" heated recessed air door offers 42 kW heating with three 1 HP motors, two-speed operation, Intelliswitch control, and a hinged aluminum access panel. cULus certified, for mounting heights up to 16 ft.#@@#General Info#@#Description #@#
This model holds cULus certification and ships made in USA, which supports procurement policies that require certified safety standards and domestic manufacturing. Buyers gain documented conformity for code compliance and predictable lead times.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect electrical connections monthly and tighten terminals to prevent arcing. Replace damaged wiring immediately and verify 480 volts, 3-Ph supply with a qualified electrician. Clean intake grille and fan blades weekly to maintain airflow; remove debris with a soft brush and low-pressure air. Lubricate motor bearings per manufacturer intervals and check for vibration; balance fans if imbalance exceeds limits. Verify Intelliswitch settings after service and test two-speed operation under load.