This unit carries cETLus and ETL Sanitation certifications and operates on 115v, 60 Hz, single-phase power with a NEMA 5-15P plug and 2.5 amps draw. Facilities meet inspection requirements and integrate the stand into existing electrical infrastructure without complex upgrades.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug unit before cleaning. Remove contents and drawers; wash in warm, soapy water. Clean interior with mild detergent and a soft cloth; avoid abrasive pads. Wipe door gaskets and check seals. Vacuum condenser coils monthly; use a brush to remove grease and dust. Sanitize food-contact areas with a CDC-approved sanitizer and air dry. Reassemble dry parts and reconnect power. Regular cleaning prevents contamination, fire risk, higher bills, and equipment failure.#@@#Additional Info#@#Asber’s ACBR-52 chef base offers 36 cu. ft. capacity with two insulated drawers for two 12" x 20" pans, R-290 refrigeration, digital control at 32°–41°F, stainless steel, 4" casters, 115v, 1/10 HP, cETLus and ETL Sanitation certified.#@@#General Info#@#Description #@#
This unit carries cETLus and ETL Sanitation certifications and operates on 115v, 60 Hz, single-phase power with a NEMA 5-15P plug and 2.5 amps draw. Facilities meet inspection requirements and integrate the stand into existing electrical infrastructure without complex upgrades.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Maintain the Asber ACBR-52 by cleaning condenser coils monthly to preserve airflow and cooling efficiency. Wipe stainless steel surfaces with a damp cloth and mild detergent; avoid abrasive pads to prevent finish damage. Defrost according to manufacturer intervals and remove standing water. Inspect door seals weekly and tighten or replace worn gaskets to prevent temperature loss. Verify temperature with calibrated probe; adjust digital control to maintain 32°–41°F and document readings daily.