For high-capacity kitchens and service operations that require controlled temperature storage without a built-in floor, this walk-in cooler box offers consistent cooling performance and straightforward installation. Designed for indoor use, it features embossed coated steel finishes and NSF vinyl sealers to meet sanitary requirements while minimizing installation time. Facility managers will appreciate the modular Fast-Trak assembly, which simplifies site handling and allows for rapid integration into existing footprints.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug equipment and remove contents. Scrape loose debris, then wash surfaces with a mild detergent and warm water using non-abrasive cloths. Rinse with clean water and sanitize food-contact areas per CSA or local guidelines. Clean vents, coils, and grease traps weekly; degrease ovens and hoods as required to reduce fire risk. Inspect seals and hinges; replace worn parts. Dry all surfaces before restoring power to prevent electrical faults.#@@#Additional Info#@#Norlake's Fast-Trak indoor walk-in, model 10X12X7-4, measures 10' x 12' x 7'-4" with 26 gauge steel panels and NSF vinyl sealers. It has a self-closing door, weighs 1413 pounds, and supports modular refrigeration for food service.#@@#General Info#@#Description #@#
For high-capacity kitchens and service operations that require controlled temperature storage without a built-in floor, this walk-in cooler box offers consistent cooling performance and straightforward installation. Designed for indoor use, it features embossed coated steel finishes and NSF vinyl sealers to meet sanitary requirements while minimizing installation time. Facility managers will appreciate the modular Fast-Trak assembly, which simplifies site handling and allows for rapid integration into existing footprints.
#@@# Panel Construction#@#
Engineers specify 26 gauge embossed coated steel for both interior and exterior panels, delivering structural rigidity and a smooth, cleanable surface. Technicians will value the finish's resistance to corrosion and its ability to withstand routine cleaning protocols, preserving surface integrity over time.
#@@# Floorless Design#@#
Contractors benefit from a floorless configuration that eliminates the need for on-site floor framing, allowing placement over existing flooring or trench drains. Project teams gain flexibility for retrofit projects and can align the cooler's footprint to specific slab conditions without major demolition.
#@@# NSF Vinyl Seals#@#
Facility staff enjoy the advantages of NSF vinyl sealers that maintain air integrity at panel joints and door perimeters, reducing infiltration and stabilizing internal temperature. Operations personnel can expect improved energy consistency and simplified sanitation checks during inspections.
#@@# Self-Closing Door#@#
Kitchen personnel interact with a self-closing door equipped with a locking deadbolt handle, enhancing safety and controlling access. Supervisors achieve tighter temperature control through consistent door closure and secure staff-only access when required.
#@@# Modular Fast-Trak Assembly#@#
Installation crews utilize the Fast-Trak modular system to expedite assembly and reduce labor hours on site, enabling phased installation across busy facilities.
#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect vinyl sealers weekly and replace damaged strips to maintain hygiene. Lubricate hinges and the locking deadbolt monthly with food-safe lubricant for smooth operation. Clean embossed coated steel surfaces with neutral detergent and a soft cloth after heavy use to prevent corrosion. Verify panel integrity and seal compression quarterly to prevent air infiltration. Level support structure before installing floorless units and confirm CSA and NSF compliance during commissioning.