The 87.5 inch overall width fits extended serving stations while the double style allows for paired operation when greater coverage proves necessary. Engineers value the 60 Hz design and 1-Ph compatibility for straightforward electrical planning.
LongDescription#@#NA#@@#Cleaning Instructions#@#Unplug the unit and let it cool. Remove dust and debris from the reflector and housing with a soft brush. Wipe aluminum surfaces with a mild detergent and a non-abrasive cloth; rinse and dry. Clean heater rods gently to avoid damage. Inspect 14" legs, hardware, and connections; tighten or replace worn parts. Maintain vents and light assemblies to prevent grease buildup and reduce fire risk. Regular cleaning preserves performance and safety.#@@#Additional Info#@#Hatco’s GR2AL-84D6 Glo-Ray dual strip heater provides 3,420 watts at 120v. It features aluminum construction, 6" spacing, infrared rods, integrated lights, 14" legs, cULus and UL EPH classification, and is Made in USA for reliable food holding.#@@#General Info#@#Description #@#
The 87.5 inch overall width fits extended serving stations while the double style allows for paired operation when greater coverage proves necessary. Engineers value the 60 Hz design and 1-Ph compatibility for straightforward electrical planning.#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect heating elements weekly for discoloration or deformation; replace any compromised heating rod immediately. Remove dust and grease from aluminum surfaces with a soft cloth and nonabrasive detergent; avoid solvents. Verify electrical connections at 120v, 60 Hz, and tighten terminals while power is off. Measure leg height and clearances; maintain 14" support legs and 6" spacing to prevent overheating. Test lights and infrared output monthly, documenting service dates.