Stop settling for ad hoc entry control when traffic and climate demands require engineered solutions. This low-profile air curtain delivers targeted airflow control for doorways up to 8 feet, operating on standard 120 volts and a single-phase electrical supply. It effectively reduces infiltration, maintains interior comfort, and supports HVAC efficiency in commercial facilities. The unit can be mounted on either the exterior or interior sides and operates on a reliable 1/5 HP motor with two selectable speeds to match site conditions and occupancy patterns.
LongDescription#@#NA#@@#Cleaning Instructions#@#Wipe exterior surfaces with mild detergent and warm water; use a soft cloth to remove grease and debris from grilles and housings. Rinse with clean water and dry immediately to prevent corrosion. Sanitize high-touch controls and brackets with an EPA-registered disinfectant per label time. Inspect screws and motor area monthly; tighten fasteners and remove dust with a soft brush or low-pressure air. Regular cleaning prevents contamination, deters pests, and preserves finish.#@@#Additional Info#@#Berner CLC08-1030A air curtain offers an unheated, low-profile solution for doors up to 8 Ft. It runs on a 120 volts, 1-Ph system with a 1/5 HP motor, is cULus certified, made in the USA, fits 24"–35" openings, and aids airflow control.#@@#General Info#@#Description #@#
Stop settling for ad hoc entry control when traffic and climate demands require engineered solutions. This low-profile air curtain delivers targeted airflow control for doorways up to 8 feet, operating on standard 120 volts and a single-phase electrical supply. It effectively reduces infiltration, maintains interior comfort, and supports HVAC efficiency in commercial facilities. The unit can be mounted on either the exterior or interior sides and operates on a reliable 1/5 HP motor with two selectable speeds to match site conditions and occupancy patterns.
#@@# Motor Performance#@#
A single 1/5 HP motor drives the unit, providing consistent airflow across the opening with two speeds for operational flexibility. Installers benefit from the motor power matching common commercial electrical services, enabling predictable performance in high-traffic environments.
#@@# Coverage Capacity#@#
Designed for openings up to 8 feet, the airflow pattern covers typical retail, institutional, and food service entrances to limit the ingress of outside air and contaminants. Facility managers achieve pressure control and thermal separation without bulky housings that interfere with signage or door operation.
#@@# Compact Mounting#@#
The low-profile form factor fits flush above most door frames and accommodates mounting on either exterior or interior walls. Contractors appreciate the reduced clearance needs that simplify retrofit projects in tight storefronts and service corridors.
#@@# Electrical Compatibility#@#
Engineers will note the 120 volts, 1-Ph specification aligns with widespread commercial circuits, minimizing the need for specialized wiring. Technicians can integrate the unit into existing panels while maintaining code compliance, aided by cULus certification.
#@@# Durability and Origin#@#
Fabrication in the USA assures consistent material and assembly standards, and the unheated design eliminates heating elements that increase maintenance complexity.
#@@#Delivery Details#@#
• Please ensure to handle the product with utmost care.
• Check if the product you have received has all the essential parts and accessories.
• Make sure to examine the product for damage before signing the delivery receipt.
• Contact customer service for delivery concerns.
• Delivery times may vary based on location.#@@#deliverynotes#@#NA#@@#Maintenance Guide#@#Inspect the Berner CLC08-1030A air curtain weekly for dust accumulation and clean intake grilles with a vacuum and soft brush to maintain airflow. Remove and wipe fan blades with a damp cloth and mild detergent; dry components thoroughly before restart. Verify mounting hardware and seals for tightness and replace deteriorated gaskets. Lubricate motor bearings per manufacturer schedule and test both speeds and electrical connections at 120v, 60 Hz, 1-Ph for reliable operation.